Design and build
1200 Tonnes
Preston Animate
Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.
Find out more
Engineered
5500
West Bromwich Energy Recovery Facility
We delivered all the supporting structures for a new EfW plant in West Bromwich.
Find out more
Engineered
300 Tonnes
Royal Shrewsbury Hospital
Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.
Find out more
Design & Build
1300 Tonne
The Manchester College (TMC)
The Manchester College (TMC) is a 5 storey structure for higher and further education students.
Find out more
Design & build
1600 Tonnes
Bank House
Hambleton Steel was responsible for the steelwork fabrication, erection and we applied perimeter intumescent paint to the building.
Find out more
Engineered
1580 tonnes
Cheltenham Grandstand
Working with Kier Construction, we delivered the steel frame for Cheltenham Grandstand.
Find out more
Engineered
1500 Tonne
Headingley Stadium
Hambleton Steel were appointed to complete the structural steelwork on Headingley Stadium's North and South stands, completing the works in February 2019.
Find out more
Engineered
2575
Rochdale Riverside
Hambleton were appointed to the Rochdale Riverside retail project to provide technical expertise on the design and deliver structural steelwork.
Find out more
Engineered
650
Princess Elizabeth Hospital
Hambleton Steel delivered the fabrication and erection of over 11,000m² of structural steelwork for the Princess Elizabeth Hospital expansion, providing efficient logistics and on-time delivery.
Find out more