- Structural steel frame
- PC terracing
- Barriers
- PC stairs
Product Description
Work on this project included the South Stand, a cantilever roof over the Rugby Stand and North Stand, and a cantilever roof over Rugby and Cricket Stands. Pavilion - Link between existing East Stand and New North Stand. Providing metal decking, lewis deck, metal work, installation only of PCC Terrace Units, Steps, Stairs and Wall Units.
Value Engineering
Cantilever showed signs of bending over further than it should be. Our design team provided a solution by redistributing forces beyond the elastic limit through meticulous calculation and advanced simulation techniques to assess how the frame responds under various loading scenarios, aiming to maintaining structural stability.
Our projects
Engineered
2575
Rochdale Riverside
Hambleton were appointed to the Rochdale Riverside retail project to provide technical expertise on the design and deliver structural steelwork.
Read more
Engineered
1120
Derby Energy from Waste Facility
Interserve appointed Hambleton Steel to deliver the structural steelwork for the Turbine Hall, FGT Hall, Ash Bunker and MBT Hall of a new EfW facility.
Read more
Engineered
4000
West Bromwich Energy Recovery Facility
We delivered all the supporting structures for a new EfW plant in West Bromwich.
Read more