Location

Leicester

Sector

Retail

Type

Engineered

Weight

1725 tonnes

Scope of work:

  1. Structural steelwork
  2. Metal decking
  3. Open grid flooring

Fosse Shopping Park is one of Britain’s largest out of town retail parks and it is situated on the southern edge of Leicester.

It attracts 11 million visitors per year and the proposed Fosse Park West and Food Court is a significant extension of the site. It will take over an adjacent site which was formerly Everards Brewery.

The new Fosse Park West and Food Court will consist of two anchor units, an A1 retail terrace, two A3 pod units, with a dedicated main customer car park, service yards and extensive public realm and Section 278 works.

The Food Court development will require the demolition of an existing building and replacement with a new, part single-storey and part two-storey steel-framed building to provide four Class A1 retail units and 15 Class A3 food/restaurant units. These will range from fast food to casual dining and restaurants, together with a management suite and customer facilities. The new development will add 140,000 square foot of new retail and restaurant space.

Bowmer and Kirkland were the main contractor for the project and they were responsible for delivering the Fosse Park West and Food Court expansion. Mellor Bromley, a mechanical services provider, was awarded a contract by Bowmer + Kirkland to provide mechanical services such as air conditioning, water services, ventilation, sanitary ware, a sprinkler system, and above-ground drainage.

Working alongside Bowmer and Kirkland, Hambleton Steel delivered the structural steelwork for two areas of the development. We also providing the metal decking and open grid flooring for this project.

quote marks

Skilled and supportive on managing the quite large number of changes on design during construction stage.

quote marks

Joaquín Salmonte - Acciona

quote marks

The team was consistently attentive, productive and always willing to go the extra mile to help wherever possible.

quote marks

IHP l Shrewsbury Hospital

quote marks

We were exceptionally impressed with the way Hambleton Steel incorporated with our design team to produce a suitable and robust design which reflects in the operational performance on site.

quote marks

GMI - Mountpark Ferrybridge

quote marks

Earning industry experience and a qualification has been invaluable. Not every opportunity gives you on-the-job experience and I've found that this has really helped my development

quote marks

Charlie Fixter, Trainee Contracts Manager

quote marks

One of the reasons I chose an apprenticeship was because I could earn and learn at the same time. Working at Hambleton Steel has provided me with day-to-day training and experience which has helped me understand the industry and business.

quote marks

Jake Dolan, Apprentice Estimator

Our projects

View All
Retail Mixed Use

Design and build

1200 Tonnes

Preston Animate

Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.

Read more

Energy Infrastructure

Engineered

5500 Tonnes

West Bromwich Energy Recovery Facility

We delivered all the supporting structures for a new EfW plant in West Bromwich.

Read more

Infrastructure Health

Engineered

300 Tonnes

Royal Shrewsbury Hospital

Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.

Read more