Location

Northamptonshire

Sector

Education

Type

Design & build

Weight

300 Tonnes

Scope of work:

  1. Design and build of structural steelwork
  2. Thermal breaks
  3. Metal decking

The Wellingborough School in Northamptonshire was established over 400 years ago and it is currently undergoing a 30 year modernisation plan. The school was founded in 1595 as a Tudor-era grammar school and it has been developed many times over the centuries. It currently accommodates students from nursery age through to sixth form.

The first phase of the renovation project involves the expansion of the design, technology and science facilities. The new Technology Centre and Gatehouse will feature workshops, a lecture theatre for 220 students, seminar rooms and a computer lab. The two storey building has a full height atrium and several pitched roofs. The centre will also house a new reception area, medical and welfare facilities, as well as multi-purpose teaching spaces.

The existing Design and Technology department is currently off site. The development of the new centre was seen as a priority by the school as part of its modernisation plan so that it could sit alongside the IT department.

The design and materials used in the construction of the building were chosen with care to reflect the school’s heritage while also creating a modern and innovative space. The large glass fronted reception will flood the area with natural light, while the red brick and stone reflects the Victorian era.

Hambleton Steel provided the design and build of the structural steelwork, thermal breaks and the metal decking for the building. One of the challenges with this project was that the roof was a fairly complex design, with several pitched areas. This required the team to use deep purlins to handle the snow drift, which in turn meant we had to be careful with the bulk heads that the steel created.

Future development plans for the school include new sports, science and teaching facilities, as well as a new art and theatre venue. The new Technology Centre will provide students with state of the art facilities which will enhance the school’s offering in design technology, computing and food technology.

quote marks

Earning industry experience and a qualification has been invaluable. Not every opportunity gives you on-the-job experience and I've found that this has really helped my development

quote marks

Charlie Fixter, Trainee Contracts Manager

quote marks

One of the reasons I chose an apprenticeship was because I could earn and learn at the same time. Working at Hambleton Steel has provided me with day-to-day training and experience which has helped me understand the industry and business.

quote marks

Jake Dolan, Apprentice Estimator

quote marks

Working with Hambleton Steel on Manchester City Campus College was an enjoyable experience for ourselves and the wider design team. Hambleton brought their knowledge and skill by collaboratively working with the whole team from RIBA Stages 2/3 until completion by problem solving, giving advise on buildability and bringing efficiencies to the design to ensure it maintained within budget.

quote marks

Latifah McIntosh - Willmott Dixon

quote marks

They’ve done a cracking job on here for us and I personally would have no hesitation in using them again.

quote marks

Lee Hughes - Vinci

quote marks

Pleasure working with you and your team, and great turnround on the scheme and a good finished product with no major issues on site along with a final account agreed, cant do much better than that. Happy to put you forward where we can and would definitely work with yourselves again.

quote marks

Peter Dodd - Vinci

Our projects

View All
Retail Leisure Infrastructure

Engineered

2575

Rochdale Riverside

Hambleton were appointed to the Rochdale Riverside retail project to provide technical expertise on the design and deliver structural steelwork.

Read more

Energy

Engineered

1120

Derby Energy from Waste Facility

Interserve appointed Hambleton Steel to deliver the structural steelwork for the Turbine Hall, FGT Hall, Ash Bunker and MBT Hall of a new EfW facility.

Read more

Energy

Engineered

4000

West Bromwich Energy Recovery Facility

We delivered all the supporting structures for a new EfW plant in West Bromwich.

Read more