- Structural Steel
- PC Stairs
- Cold Rolled
Hambleton Steel was appointed by main contractor B&K to fabricate and erect the structural steelwork for Stafford College’s new three-storey teaching facility.
The building includes lecture theatres, sports halls, workshops and a large open atrium, with a partial plant deck roof.
Hambleton’s scope also covered associated sub-trades, including precast stairs and cold rolled steelwork. The team successfully completed the on-site steel erection within a 12-week programme, delivering a quality structure to support the college’s modern educational facilities.
Our projects
Design and build
1200 Tonnes
Preston Animate
Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.
Read more
Engineered
5500 Tonnes
West Bromwich Energy Recovery Facility
We delivered all the supporting structures for a new EfW plant in West Bromwich.
Read more
Engineered
300 Tonnes
Royal Shrewsbury Hospital
Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.
Read more