Because of our work on the TFST (Typhoon Future Synthetic Training) Building, we were awarded the SLA building next door by the main contractor. And then the link bridge connecting the two buildings.
Hambleton Steel started with Phase 2, the TFST Facility. With the nature of the building and load requirements for the tornado jets, the base needed to be a concrete structure. Hambleton Steel were instructed to build a first and second storey steel structure on top of this. The structure requirements needed to be engineered to the already in in-situ concrete base.
Our projects
Design and build
1200 Tonnes
Preston Animate
Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.
Read more
Engineered
5500 Tonnes
West Bromwich Energy Recovery Facility
We delivered all the supporting structures for a new EfW plant in West Bromwich.
Read more
Engineered
300 Tonnes
Royal Shrewsbury Hospital
Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.
Read more