Location

Goole

Sector

Industrial

Type

Design and build

Weight

385 Tonnes

Scope of work:

Execution Class 3

  1. Structural steelwork
  2. Trusses and overhead crane support
  3. Cold Rolled

 

We provided the structural steelwork for the design and build training facility, as well as truss and overhead crane support for phases 1 and 2 of the train facility. 

Working with GMI, Hambleton Steel were appointed to design and build a steel framed train facility on behalf of their client, Siemens.​ The train manufacturing plant and supply chain rail village is in Goole, East Yorkshire, and the site will bring nearly 1,000 jobs to the area, and around 1,700 jobs in the supply chain.

Hambleton Steel delivered the structural steelwork package for Phase Two of Siemens’ Goole manufacturing facility, comprising the Rain Test building and Traction Drive building within the existing Goole site. The project involved two crane-served industrial buildings and included both hot-rolled and cold-rolled steelwork, supplied to meet demanding operational and programme requirements.

The project demonstrates Hambleton Steel’s capability in supporting large-scale industrial developments, providing high-quality fabricated steelwork aligned with tight timescales and complex site logistics.

Goole Train Manufacturing Facility
quote marks

Earning industry experience and a qualification has been invaluable. Not every opportunity gives you on-the-job experience and I've found that this has really helped my development

quote marks

Charlie Fixter, Trainee Contracts Manager

quote marks

One of the reasons I chose an apprenticeship was because I could earn and learn at the same time. Working at Hambleton Steel has provided me with day-to-day training and experience which has helped me understand the industry and business.

quote marks

Jake Dolan, Apprentice Estimator

quote marks

Working with Hambleton Steel on Manchester City Campus College was an enjoyable experience for ourselves and the wider design team. Hambleton brought their knowledge and skill by collaboratively working with the whole team from RIBA Stages 2/3 until completion by problem solving, giving advise on buildability and bringing efficiencies to the design to ensure it maintained within budget.

quote marks

Latifah McIntosh - Willmott Dixon

quote marks

They’ve done a cracking job on here for us and I personally would have no hesitation in using them again.

quote marks

Lee Hughes - Vinci

quote marks

Pleasure working with you and your team, and great turnround on the scheme and a good finished product with no major issues on site along with a final account agreed, cant do much better than that. Happy to put you forward where we can and would definitely work with yourselves again.

quote marks

Peter Dodd - Vinci

Our projects

View All
Retail Leisure

Design and build

1200 Tonnes

Preston Animate

Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.

Read more

Energy Infrastructure

Engineered

5500 Tonnes

West Bromwich Energy Recovery Facility

We delivered all the supporting structures for a new EfW plant in West Bromwich.

Read more

Infrastructure Health

Engineered

300 Tonnes

Royal Shrewsbury Hospital

Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.

Read more