Location

Rochdale

Sector

Retail

Type

Engineered

Weight

2575 Tonnes

Scope of work:

  1. Redesign to reduce fabrication costs
  2. Bespoke design
  3. Structural steelwork
  4. Plate Girders

Project Description

Rochdale Riverside includes 200,000 square feet of retail, leisure accommodation, a six-screen cinema and a 520-space car park that is central to the town centre. Hambleton Steel were instructed on a design and build basis, for this 18,500 m2 of five steel-framed retail and leisure accommodation. This new development will play a key role in helping to make Rochdale town centre a sustainable day and night destination. It also will create 1,000 jobs in the area and help to stimulate the local economy.


Challenges l Solutions

We could see at the tender stage, through design input from our technical team, that some of the buildings had unnecessary costs within the steel design. The proximity to the tram line was both an access and time issue. Many of the cantilevering elements on the façade of the cinema required multiple support systems to make them erectable. At tender stage, our design team redesigned these as plate girders to reduce fabrication costs.

Our design team, provided bespoke solutions throughout the design stage. This was due to the schemes being inherently unique in respect to stability space availability. This was something our team found a solution for early on.

Careful planning, working with other subcontractors and overnight working was factored into our programme, ensuring we did not impact the live environment and rail travel in the local a rea.

Rochdale Riverside is only the first phase of the regeneration of the town as a growing population has put pressure on the housing market. The local council is planning to build an additional 10,500 new homes which includes Upperbanks, a residential development comprising 242 new homes, a 146-bed Hilton hotel and new commercial space for local businesses.

quote marks

Skilled and supportive on managing the quite large number of changes on design during construction stage.

quote marks

Joaquín Salmonte - Acciona

quote marks

The team was consistently attentive, productive and always willing to go the extra mile to help wherever possible.

quote marks

IHP l Shrewsbury Hospital

quote marks

We were exceptionally impressed with the way Hambleton Steel incorporated with our design team to produce a suitable and robust design which reflects in the operational performance on site.

quote marks

GMI - Mountpark Ferrybridge

quote marks

Earning industry experience and a qualification has been invaluable. Not every opportunity gives you on-the-job experience and I've found that this has really helped my development

quote marks

Charlie Fixter, Trainee Contracts Manager

quote marks

One of the reasons I chose an apprenticeship was because I could earn and learn at the same time. Working at Hambleton Steel has provided me with day-to-day training and experience which has helped me understand the industry and business.

quote marks

Jake Dolan, Apprentice Estimator

Our projects

View All
Retail Mixed Use

Design and build

1200 Tonnes

Preston Animate

Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.

Read more

Energy Infrastructure

Engineered

5500 Tonnes

West Bromwich Energy Recovery Facility

We delivered all the supporting structures for a new EfW plant in West Bromwich.

Read more

Infrastructure Health

Engineered

300 Tonnes

Royal Shrewsbury Hospital

Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.

Read more