Location

Ripely

Sector

Blue Light

Type

Design & Build

Weight

250 Tonnes

Scope of work:

 

  1. Structural steelwork
  2. PC Stairs
  3. Metal Decking
  4. Internal Cladding

A joint venture for Derbyshire Fire & Rescue and Derbyshire Police, we were instructed with the structural steelwork frame together with metal decking and PC stairs for a brand-new training facility.

The premises include a new two-storey training building with an attached vehicle garage and associated training buildings for Derbyshire Fire and Rescue Service, along with fire behaviour simulation training facilities, training towers and search and rescue facilities. 

The firing range had to have protective internal cladding and a very low air flow. The structure in the firing range was designed to make sure it was suitable for shooting purposes and in line with police training requirements. The building had protective sheets inside to make sure it could absorb the bullets. The floors also had to be jointless. 

quote marks

Skilled and supportive on managing the quite large number of changes on design during construction stage.

quote marks

Joaquín Salmonte - Acciona

quote marks

The team was consistently attentive, productive and always willing to go the extra mile to help wherever possible.

quote marks

IHP l Shrewsbury Hospital

quote marks

We were exceptionally impressed with the way Hambleton Steel incorporated with our design team to produce a suitable and robust design which reflects in the operational performance on site.

quote marks

GMI - Mountpark Ferrybridge

quote marks

Earning industry experience and a qualification has been invaluable. Not every opportunity gives you on-the-job experience and I've found that this has really helped my development

quote marks

Charlie Fixter, Trainee Contracts Manager

quote marks

One of the reasons I chose an apprenticeship was because I could earn and learn at the same time. Working at Hambleton Steel has provided me with day-to-day training and experience which has helped me understand the industry and business.

quote marks

Jake Dolan, Apprentice Estimator

Our projects

View All
Retail Mixed Use

Design and build

1200 Tonnes

Preston Animate

Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.

Read more

Energy Infrastructure

Engineered

5500 Tonnes

West Bromwich Energy Recovery Facility

We delivered all the supporting structures for a new EfW plant in West Bromwich.

Read more

Infrastructure Health

Engineered

300 Tonnes

Royal Shrewsbury Hospital

Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.

Read more