Location

Redcar

Sector

Leisure

Type

Engineered

Weight

1250 Tonnes

Scope of work:

Redcar Leisure Centre & Civic Offices

  1. Structural steelwork
  2. PC Stairs
  3. PC Floor Planks
  4. Metal Decking
  5. Hollowcore Flooring
  6. Cold Rolled

Located in the north-eastern coastal town of Redcar, the Leisure and Community Heart forms a key part of the town’s wider regeneration programme, drawing on Redcar’s long association with steelmaking. 

Hambleton Steel was instructed by Willmott Dixon to deliver the structural steelwork package for the new Redcar Leisure & Community Heart - a major leisure centre and civic office development designed to serve the wider community.

The project comprises a multi-use leisure facility incorporating sports halls, swimming pool areas, civic office space, and associated amenities. The steel frame solution included approximately 1,225 tonnes of hot rolled steelwork and 19 tonnes of cold rolled sections, forming the primary structure across the development. Three large-span trusses were installed to the sports hall along with four cellular beams to the swimming pool area, with the paint specification adjusted to meet the requirements of the chlorinated environment.

 

Project Challenges

The scheme was delivered within a tight site footprint, making logistics and delivery coordination critical to maintaining programme. Careful sequencing and close collaboration with the main contractor ensured efficient installation despite restricted access and high activity levels on site.

quote marks

Skilled and supportive on managing the quite large number of changes on design during construction stage.

quote marks

Joaquín Salmonte - Acciona

quote marks

The team was consistently attentive, productive and always willing to go the extra mile to help wherever possible.

quote marks

IHP l Shrewsbury Hospital

quote marks

We were exceptionally impressed with the way Hambleton Steel incorporated with our design team to produce a suitable and robust design which reflects in the operational performance on site.

quote marks

GMI - Mountpark Ferrybridge

quote marks

Earning industry experience and a qualification has been invaluable. Not every opportunity gives you on-the-job experience and I've found that this has really helped my development

quote marks

Charlie Fixter, Trainee Contracts Manager

quote marks

One of the reasons I chose an apprenticeship was because I could earn and learn at the same time. Working at Hambleton Steel has provided me with day-to-day training and experience which has helped me understand the industry and business.

quote marks

Jake Dolan, Apprentice Estimator

Our projects

View All
Retail Mixed Use

Design and build

1200 Tonnes

Preston Animate

Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.

Read more

Energy Infrastructure

Engineered

5500 Tonnes

West Bromwich Energy Recovery Facility

We delivered all the supporting structures for a new EfW plant in West Bromwich.

Read more

Infrastructure Health

Engineered

300 Tonnes

Royal Shrewsbury Hospital

Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.

Read more