Prologis DC5 & DC6, Heathrow
Hambleton Steel delivered the structural steelwork package for Prologis DC5 & DC6 at Prologis Park West London, a major logistics development strategically located close to Heathrow Airport. The project comprised two high-quality distribution warehouses, with DC5 and DC6 providing a combined floor area of more than 337,000 sq ft. The scale and specification of the development demanded a coordinated approach to steel design, fabrication and installation, with Hambleton Steel managing the steelwork package from manufacture through to site delivery and erection.
The package incorporated approximately 554 tonnes of structural steel, comprising 465 tonnes of hot-rolled steel and 89 tonnes of cold-rolled steel, with almost 2,900 individual steel components fabricated for the project. Hambleton Steel’s integrated approach to estimating, 3D detailing, fabrication, logistics and site installation enables complex projects of this scale to be delivered safely, efficiently and to programme.
Our projects
Design and build
1200 Tonnes
Preston Animate
Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.
Read more
Engineered
5500 Tonnes
West Bromwich Energy Recovery Facility
We delivered all the supporting structures for a new EfW plant in West Bromwich.
Read more
Engineered
300 Tonnes
Royal Shrewsbury Hospital
Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.
Read more