Location

Guernsey

Sector

Health

Type

Engineered

Weight

650 Tonnes

Scope of work:

  1. Structural Steelwork
  2. Metal Decking

Project Description

As Guernsey’s principal healthcare facility, the Princess Elizabeth Hospital required a major expansion to support the island’s growing healthcare needs. Hambleton Steel was appointed to deliver over 11,000m² of structural steelwork, forming part of an ongoing multi-phase investment in the hospital’s infrastructure.

This earlier phase of development demonstrated our ability to manage complex logistics and technical demands with precision, ensuring delivery to exact specification and within tight programme constraints.

 

Challenges l Solutions 

Situated on the Channel Islands, the project presented unique logistical challenges. Every load of fabricated steel was transported from Portsmouth to Guernsey, requiring meticulous planning and coordination between our fabrication team, shipping partners, and on-site installation crews.
To maintain the project schedule, steel was dispatched in erectable batches, allowing for direct installation upon arrival.

Construction took place within the operational hospital site, demanding strict adherence to health and safety protocols and minimal disruption to ongoing medical services. Close collaboration with the main contractor and hospital management ensured that all works were completed safely and without impacting daily operations.

Despite the complexities of transport and site constraints, the 20-week erection programme was delivered seamlessly, reflecting our team’s commitment to precision planning, quality workmanship, and timely execution.

quote marks

Skilled and supportive on managing the quite large number of changes on design during construction stage.

quote marks

Joaquín Salmonte - Acciona

quote marks

The team was consistently attentive, productive and always willing to go the extra mile to help wherever possible.

quote marks

IHP l Shrewsbury Hospital

quote marks

We were exceptionally impressed with the way Hambleton Steel incorporated with our design team to produce a suitable and robust design which reflects in the operational performance on site.

quote marks

GMI - Mountpark Ferrybridge

quote marks

Earning industry experience and a qualification has been invaluable. Not every opportunity gives you on-the-job experience and I've found that this has really helped my development

quote marks

Charlie Fixter, Trainee Contracts Manager

quote marks

One of the reasons I chose an apprenticeship was because I could earn and learn at the same time. Working at Hambleton Steel has provided me with day-to-day training and experience which has helped me understand the industry and business.

quote marks

Jake Dolan, Apprentice Estimator

Our projects

View All
Retail Mixed Use

Design and build

1200 Tonnes

Preston Animate

Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.

Read more

Energy Infrastructure

Engineered

5500 Tonnes

West Bromwich Energy Recovery Facility

We delivered all the supporting structures for a new EfW plant in West Bromwich.

Read more

Infrastructure Health

Engineered

300 Tonnes

Royal Shrewsbury Hospital

Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.

Read more