Location

Guernsey

Sector

Education

Type

Engineered

Weight

800 Tonnes

Scope of work:

  1. Structural steelwork

Project Description

Hambleton Steel successfully delivered the complete structural steel package for the landmark Les Nicolles School development in Guernsey.

The scheme comprised two interconnected schools within a single 240m-long structure: St Sampson’s Secondary School and Le Murier Special Needs School, each with distinct layouts and functions but sharing central facilities such as a swimming pool, sports hall, and assembly spaces.

Working to complex design requirements and tight island logistics, Hambleton managed the transport of all steelwork from the UK mainland, optimizing loads and sequencing to fit shipping constraints.

Challenges l Solutions

The erection was completed in three carefully phased stages, coordinated around limited local crane capacities and ongoing concrete works. Spanning up to 19m over the swimming pool and sports hall, the project demonstrated Hambleton’s expertise in precision steel erection, logistical planning, and collaborative problem-solving.

quote marks

Skilled and supportive on managing the quite large number of changes on design during construction stage.

quote marks

Joaquín Salmonte - Acciona

quote marks

The team was consistently attentive, productive and always willing to go the extra mile to help wherever possible.

quote marks

IHP l Shrewsbury Hospital

quote marks

We were exceptionally impressed with the way Hambleton Steel incorporated with our design team to produce a suitable and robust design which reflects in the operational performance on site.

quote marks

GMI - Mountpark Ferrybridge

quote marks

Earning industry experience and a qualification has been invaluable. Not every opportunity gives you on-the-job experience and I've found that this has really helped my development

quote marks

Charlie Fixter, Trainee Contracts Manager

quote marks

One of the reasons I chose an apprenticeship was because I could earn and learn at the same time. Working at Hambleton Steel has provided me with day-to-day training and experience which has helped me understand the industry and business.

quote marks

Jake Dolan, Apprentice Estimator

Our projects

View All
Retail Mixed Use

Design and build

1200 Tonnes

Preston Animate

Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.

Read more

Energy Infrastructure

Engineered

5500 Tonnes

West Bromwich Energy Recovery Facility

We delivered all the supporting structures for a new EfW plant in West Bromwich.

Read more

Infrastructure Health

Engineered

300 Tonnes

Royal Shrewsbury Hospital

Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.

Read more