Hambleton Steel delivered approximately 390 tonnes of structural steelwork for Houghton Primary Care Centre in Houghton-le-Spring, working with Willmott Dixon on this major healthcare development. The £20m centre was designed as an integrated community facility, bringing together GP services, an illness and injuries unit, diagnostics and planned care, physiotherapy and a 24-bed rehabilitation unit alongside health, wellbeing and leisure facilities. The development was designed to help provide care closer to home and reduce unnecessary hospital admissions, creating a modern environment focused on patient recovery, rehabilitation and community wellbeing.
The Hambleton Steel package incorporated approximately 390 tonnes of structural steel, together with precast concrete (PCC) planks and stair systems.
Houghton Primary Care Centre also presented significant sustainability and building-performance requirements. The completed facility achieved BREEAM Outstanding, with a final score of 85.31%, and was recognised through the BREEAM Awards and other industry awards for its sustainability performance. The building incorporated renewable technologies including solar thermal and photovoltaic panels, an 18m-high wind turbine, natural ventilation and other low-carbon measures, contributing to energy consumption and emissions reported as 38% lower than a standard healthcare building.
Our projects
Design and build
1200 Tonnes
Preston Animate
Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.
Read more
Engineered
5500 Tonnes
West Bromwich Energy Recovery Facility
We delivered all the supporting structures for a new EfW plant in West Bromwich.
Read more
Engineered
300 Tonnes
Royal Shrewsbury Hospital
Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.
Read more