Hambleton Steel delivered the 380-tonne structural steel package for the Doncaster Cultural and Learning Centre, a landmark £14 million development that combines contemporary architecture with the heritage of the former Doncaster Grammar School for Girls.
The new steel-framed building was designed around the retained Edwardian entrance, preserving a key element of the site's history within a modern public facility.
The structural steelwork incorporates large open spans, prominent cantilevers and a fully glazed façade, creating a light, open and flexible environment for visitors while showcasing the retained historic architecture. Delivered for main contractor Willmott Dixon, the project demonstrates Hambleton Steel's capability in delivering substantial structural steelwork for complex public-sector and cultural developments, particularly where new construction must integrate sensitively with existing and historic structures.
Our projects
Design and build
1200 Tonnes
Preston Animate
Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.
Read more
Engineered
5500 Tonnes
West Bromwich Energy Recovery Facility
We delivered all the supporting structures for a new EfW plant in West Bromwich.
Read more
Engineered
300 Tonnes
Royal Shrewsbury Hospital
Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.
Read more