Location

Manchester

Sector

Multi-Storey Car Park

Type

Design & build

Weight

645 Tonnes

Scope of work:

  1. Structural steelwork
  2. Metal Decking

The Christie hospital in Manchester, via the Christie NHS Foundation Trust wanted to increase the number of car parking spaces across the hospital complex with the construction of a four storey multi-storey car park.

Designed by AFL Architects, and with Vinci construction as the main contractor, the new car park will provide 565 spaces, with 253 on a reconfigured surface level car park. This will increase the total number of spaces on site to 818 from the current 414. This will include 34 disabled spaces, 12 electric vehicle charging points and 26 bicycle parks.

Two existing buildings, currently used as temporary offices, will be demolished to make way for the new car park. Part of the project will also include an upgraded road junction and a new pedestrian crossing at the hospital entrance.

To reduce energy consumption, the architects of the car park included a natural ventilation strategy which also reduced the carbon footprint of the building.

Hambleton Steel worked with Vinci's North West office to deliver the structural steelwork and metal decking for the multi-storey car park. This included the project management of the design, fabrication and erection of all structural steel elements.

Other elements of the project include landscaping, lighting for the car park, the access road and security which includes CCTV, access control and security barriers. The hospital was always struggling to accommodate visitors during busy periods and by doubling the number of available spaces it will make it much easier.

The vision for the new multi-storey car park is one that complements the overall brand of the NHS trust. The north-west and north elevations will incorporate similar cladding to that of the adjacent Research Centre and to blend in with the area, a number of climbing plants will be used. These will be achieved by using steel wires to make the building blend in with the surrounding landscape.

quote marks

Skilled and supportive on managing the quite large number of changes on design during construction stage.

quote marks

JoaquĆ­n Salmonte - Acciona

quote marks

The team was consistently attentive, productive and always willing to go the extra mile to help wherever possible.

quote marks

IHP l Shrewsbury Hospital

quote marks

We were exceptionally impressed with the way Hambleton Steel incorporated with our design team to produce a suitable and robust design which reflects in the operational performance on site.

quote marks

GMI - Mountpark Ferrybridge

quote marks

Earning industry experience and a qualification has been invaluable. Not every opportunity gives you on-the-job experience and I've found that this has really helped my development

quote marks

Charlie Fixter, Trainee Contracts Manager

quote marks

One of the reasons I chose an apprenticeship was because I could earn and learn at the same time. Working at Hambleton Steel has provided me with day-to-day training and experience which has helped me understand the industry and business.

quote marks

Jake Dolan, Apprentice Estimator

Our projects

View All
Retail Mixed Use

Design and build

1200 Tonnes

Preston Animate

Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.

Read more

Energy Infrastructure

Engineered

5500 Tonnes

West Bromwich Energy Recovery Facility

We delivered all the supporting structures for a new EfW plant in West Bromwich.

Read more

Infrastructure Health

Engineered

300 Tonnes

Royal Shrewsbury Hospital

Hambleton Steel is delivering a complex and multi-phased steelwork package at the Royal Shrewsbury Hospital, encompassing both new construction and refurbishment.

Read more