Preston Animate
1200 Tonnes
Preston Animate
Working with Eric Wright, we have delivered structural steel packages to support the construction of a retail complex in Preston.
Find out more
Engineered
595 Tonnes
New Covent Garden Markets - B2
Working with Vinci, we have delivered structural steel packages to the multi-phase New Covent Garden Markets.
Find out more
Design & build
1600 Tonnes
Bank House
Alongside Bowmer and Kirkland we value engineered the steel structure to deliver the office building in 2022.
Find out more
Design & build
645 Tonnes
Christie Car Park
We worked with Vinci's North West office to deliver the structural steelwork and metal decking for Christie multi-storey car park.
Find out more
Design & Build
1300 Tonne
The Manchester College (TMC)
The Manchester College (TMC) is a 5 storey structure for higher and further education students.
Find out more
Engineered
1500 Tonne
Headingley Stadium
Hambleton Steel were appointed to complete the structural steelwork on Headingley Stadium's North and South stands, completing the works in February 2019.
Find out more
Design & Build
1060 Tonne
Darlington Train Station MSCP
The structural steelwork package on Darlington Train Station multi-storey car park was completed in December 2023.
Find out more
Engineered
1000 Tonne
Vaux Building 2
Vaux Building 2, is a 6 storey office building situated on the old Vaux Brewery site in Sunderland.
Find out more
Design & Build
1185 Tonne
Siemens Train Manufacturing Facility
Phase 1 of the Goole Train Manufacturing Facility comprises several large single storey buildings covering the various build stages of locomotives, as well as a dedicated office/welfare building, and a number of substation houses.
Find out more